What operators can run on an X-ray machine is an image-quality check, not X-ray calibration in the sense a manufacturer or a certification body uses the word. A daily check compares today's image against a baseline created with a test piece; it tells you whether the imaging chain still behaves as it did yesterday. It does not adjust the machine, does not measure dose and does not produce a certificate. This applies to an inspection system already in normal service. The sections below separate the two concepts, give the baseline checks an operator can perform, show how to recognise drift and artefacts, and state plainly where an in-house check stops and the manufacturer must be called.
Three activities are routinely called calibration, and they are not interchangeable. Confusing them is how a site ends up believing a shift checklist satisfies a legal or contractual requirement when it does not.
Factory calibration, statutory verification, and the daily operator check
Activity | Who performs it | What it establishes | Output |
Factory calibration or service adjustment | Manufacturer or authorised service | Machine parameters are set to the maker's specification | Service record, adjusted settings |
Statutory verification or inspection | Competent external body, where required | Compliance with the applicable regulatory requirement | Formal document |
Daily image-quality check | Operator on site | Current image matches an established baseline | Internal log entry |
The daily check has real value even though it is the weakest of the three: it catches the slow changes that appear between service visits. A detector gaining bad pixels, a source losing output, a stage losing repeatability — all of these show up as a difference from a reference image long before they cause an obviously bad radiograph. Keep the word "calibration" for the first two rows and call the third a baseline check, so nobody has to guess what a log entry proves.
Use one fixed test piece, one fixed set of exposure conditions and one fixed comparison rule. The point is repeatability, not absolute accuracy: you are asking whether the same object under the same settings still produces the same image.
Place the test piece at a marked position and orientation, using the same fixture each time.
Warm the system up according to the site's operating practice, then acquire the reference image at the recorded tube voltage, current, magnification and grey window.
Read a line-pair or resolution target and note the finest group that is still distinguishable.
Check a grey step wedge or uniform region for a shift in mean grey value and for new non-uniformity.
Look at the same region used by the baseline for new bright or dark pixels, rings or banding.
Record the date, shift, operator, settings and any deviation from the baseline image.
Suitable test pieces and fixtures belong with the machine's accessories, and the procedure behind the check is described in the site's guide to calibrating your X-ray PCB inspection machine. What matters is that the same piece is used every time. Swapping in a convenient board from production destroys the comparison, because you can no longer tell a machine change from a sample change.
Define "deviation" before the first shift, in terms you can actually observe: a resolution group lost, a grey value outside an agreed band, or a new artefact in a defined region. An entry that says "image looks fine" cannot be compared next week.
Look for change in a fixed order: bad pixels first, then gain non-uniformity, then artefacts that depend on the exposure. That order follows how the imaging chain degrades and keeps you from blaming the tube for a detector problem.
A few dead or hot pixels are normal and often corrected by the system's flat-field correction; a growing cluster, or a new line across the image, is a change worth logging. Widespread non-uniformity that grows with exposure time points to gain or temperature behaviour rather than to the sample. Ring or band artefacts that move when the part is moved belong to the detector or reconstruction, not the part. In each case, compare against the baseline image from the day the machine was accepted, not against yesterday's — a slow drift can look stable if every day is only compared with the day before.
The site's guide to X-ray maintenance covers the wider service tasks; this check only decides whether a trend exists. When it does, freeze the conditions, keep the images, and hand both to the service engineer. A description of "blurry images" is much less useful than two images taken a week apart under identical settings.
Geometry can be checked with a known dimension on the test piece. Image a feature of known size, measure it in the image, and compare the result with the magnification stated for that setup on the X-ray inspection system product page; then move the stage away and back to the same commanded position and re-image to see whether the feature lands in the same place.
Centring matters for CT and for any tilted view, because a rotation axis that has shifted changes the reconstruction or the oblique geometry. A simple repeatability test — ten moves to the same coordinate, noting the spread of the feature's position — gives you a number to track without any special equipment. If the spread grows over weeks, the stage or its encoder needs attention before the next batch of angled inspections.
Do not turn this into an adjustment procedure. Measuring a deviation and logging it is within an operator's remit; changing stage calibration constants or tube alignment is not. Record the measured value and the conditions, and let the service record show what was corrected.
A baseline image is evidence about image consistency, nothing more. It does not verify radiation dose, shielding performance, electrical safety or interlock function; it does not satisfy any statutory verification requirement; and it does not extend or replace the manufacturer's service interval. No dose figures, compliance values or certificate numbers belong in a shift log.
It also cannot prove that a part is acceptable. An image that matches the baseline tells you the imaging chain is behaving as before, not that a given void ratio or weld indication meets an acceptance criterion. The site's material on X-ray machine calibration describes manufacturer-level work; keep that boundary explicit in the procedure so an audit does not mistake an internal log for a calibration record.
If a contract or regulator requires a specific verification, that requirement sets the schedule and the responsible party. The daily check runs alongside it, not instead of it.
Keep a small, boring record: the baseline image and its conditions, one entry per shift with the readings defined above, every deviation and the action taken, and the service records with dates. A single file or log per machine is enough. What makes it useful is that the conditions never change silently — if exposure settings or the test piece are replaced, the baseline is re-established and the change is noted.
Stop and call the manufacturer when a resolution group is lost and does not recover on a repeat image, when a new artefact appears in the same position on multiple samples, when stage repeatability moves outside the band you set, or when any safety-related interlock or indicator behaves unexpectedly. Those are not operator adjustments. Keep the machine available for inspection, preserve the images from before and after the event, and record the time the deviation was first seen.
For fault isolation beyond that point, the maintenance guide linked above gives the service sequence. The daily check's job ends with a clear, dated observation that a competent person can act on.
At the start of every shift is a common starting point, with an additional check after any change to exposure settings, a detector correction, a service visit or a long shutdown. The right frequency depends on how the machine is used and on your own quality system; consistency matters more than the interval.
A stable object that does not change with handling: a resolution or line-pair target for detail, a uniform step or wedge for grey response, and a fixture that puts it in the same position each time. It does not need to resemble a production part. It needs to be identical every time it is imaged.
No. An internal log records image consistency. Formal verification or certification, where required, is performed by the competent external party under the applicable requirement. Keep the two documents separate and label them accordingly.
General image-quality practice: resolution targets, grey step wedges, flat-field correction and baseline comparison. No dose value, certificate number or regulatory claim is used in this article.
Seamark ZM published pages: microfocus X-ray inspection machine, accessories, and the site guides on maintenance and calibration of industrial X-ray machines, maintaining the X-ray inspection system, and calibrating an X-ray PCB inspection machine.
The machine's own operating and service documentation sets warm-up, correction and service intervals; follow it where it is stricter than anything described here.
EN
es
ko
de
it
pt
th
ar
pl
vi
tr
ru